Projects

Iringal Mooradu ROB

Back

General Details
Administrative Sanction Order Number Dated Amount(crores)
GO(Rt)No.139/2020/PWD 03.02.2020 25
District Kozhikode
LAC Koyilandy
Project Details
Actual Start Date 03.02.2020
Project Management Consultant M/s Velcity Consulting Engineers Pvt. Ltd.
Category Road Over Bridges
LC No 211-A
Railway (km) 706/200-300
Length Including Approaches NOT FINALISED
Width of ROB NOT FINALISED
GAD Status NOT FINALISED
No of Lanes NOT FINALISED
Financial Details
AS Amount(crores) 25
Funded By KIIFB
Work Progress Details
Physical progress 17 %
Current status Entrusted to RBDCK on 03.02.2020. For the preparation of DPR, LOA issued to M/s Velocity on 15.09.2020. Alignment Finalised. Draft DPR submitted by consultant and returned for correction. Project was pending due to Semi High Speed Rail project of KRDCL. On 06.12.2022, KRDCL had informed to go ahead with the construction of ROBs without considering the silver line alignment and RBDCK intimated the same to Railways on 08.12.2022. Railways directed to submit revised GAD for all ROBs long pending due to Silver line vide letter dated 14.03.2023. Instructed consultant M/s Velcity to proceed with DPR & GAD work. DPR submitted by consultant on 24.05.2023. Returned the same for corrections on 30.05.2023 & 11.06.2023. Directed the consultant to submit the corrected DPR by 16.06.2023. LUS inspection conducted on 04.07.2023. Report awaited.