Weekly Progress Report - 16.11.2020 to 21.11.2020
 
Weekly Progress Report - 16.11.2020 to 21.11.2020
16.11.2020 17.11.2020 18.11.2020 19.11.2020 20.11.2020 21.11.2020
External painting at East side Grill work. Grill work.      
Electrical duct cable tray work. SS handrail work. SS handrail work.      
HVAC duct installation work. Aluminum door work. Aluminum door work.      
SS handrail work HVAC duct installation work. HVAC duct installation work.      
Aluminum Louvre work External painting at East side. External painting at East side.      
 
Click here to view Previous Reports
 
    
HANDRAIL WORK

    
    
GRILL WORK

    
    
ALUMINIUM WORK

    
    
HVAC

    
    
ELECTRICAL WORK

    
    
PAINTING

      
 

 

 

 

 

 

 

 