Civil and Electrical Works for Developing CUSAT as International Centre for Excellence in Academics

|Photo gallery Photo Album

Weekly Progress Report - 10.08.2020 to 15.08.2020
 

 

Weekly Progress Report - 10.08.2020 to 15.08.2020

10.08.2020

11.08.2020

12.08.2020

13.08.2020

14.08.2020

15.08.2020

Plastering work for Plinth walls at Zone B in Academic Block

Plastering work for Plinth walls at Zone B in Academic Block

 

 

 

 

Cutting and bending of reinforcement for the slab,beams and columns

Form-work preparation/installation for the slab at -2.70m level at Zone A  in Academic Block

 

 

 

 

Shuttering work for stairs in Engineering Dept. Block

Cutting and bending of reinforcement for the slab,beams and columns

 

 

 

 

 

Shuttering work for stairs in Engineering Dept. Block

 

 

 

 

 

 

 

 

 

 

 
Click here to view Previous Reports
 
    
PLASTERING FOR PLINTH WALL

    
    
SHUTTERING WORK FOR STAIR

    
    
PLASTERING FOR PLINTH WALL

    
    
SHUTTERING WORK FOR STAIR

    
    
REINFORCEMENT CUTTING AND BENDING

      
 

 

 

 

 

 

 

 