Weekly Progress Report - 10.08.2020 to 15.08.2020
 
Weekly Progress Report - 10.08.2020 to 15.08.2020
10.08.2020 11.08.2020 12.08.2020 13.08.2020 14.08.2020 15.08.2020
Compaction work (Plain rolling) in embankment area (Arror side) Putty work at crash barrier (outside area)        
Putty work at crash barrier (outside area)  Metal crash barrier work progressing at Aroor side        
Metal crash barrier work progressing at Aroor side Excavation work at Thripunitura road drain portion.         
Excavation work at Thripunitura road drain portion. Painting work Progressing at Pier, pier cap on P9 location.        
  PCC for Kerb stone fixing        
 
Click here to view Previous Reports
 
    
PAINTING WORK

    
    
METAL CRASH BARRIER WORK

    
    
KERB STONE FIXING

    
    
EXCAVATION FOR DRAINAGE

    
    
PUTTY WORKS

    
    
COMPACTION WORK

    
    
METAL CRASH BARRIER WORK

    
    
PUTTY WORKS

    
    
EXCAVATION FOR DRAINAGE

      
 

 

 

 

 

 

 

 