Weekly Progress Report - 19.10.2020 to 24.10.2020
 
Weekly Progress Report - 19.10.2020 to 24.10.2020
19.10.2020 20.10.2020 21.10.2020 22.10.2020 23.10.2020 24.10.2020
DBM work at Aroor side completed on Sunday. Mastic asphalt work. Mastic asphalt work affected due to rain.      
Mastic asphalt work. Kerb stone fixing work Kerb stone fixing work      
Kerb stone fixing work at A1 retaining wall. (Crown plaza side). Reinforcement and shuttering work at pamba steel area. Planning for wall concrete. Reinforcement and shuttering work at pamba steel area. Planning for wall concrete.      
Reinforcement and shuttering work at pamba steel area. Planning for wall concrete. Metal beam crash barrier work  at aroor side (Slip road - Le meridian side)        
Metal beam crash barrier work  at aroor side (Slip road - Le meridian side)          
 
Click here to view Previous Reports
 
    
DRAINAGE WORK

    
    
DRAINAGE WORK

    
    
DRAINAGE WORK

    
    
DRAINAGE WORK

    
    
KERB WORK

    
    
DBM WORK

      
 

 

 

 

 

 

 

 